INDUSTRIAL WASTE WATER TREATMENT PLANT

WWTP_Banner-e1434650318403

PROJECT DETAILS

  • Project title: Industrial waste water treatment plant
  • Project duration: 2 years
  • Location: Almadina Almonawara.
  • Capacity: 12000 m3 /D.
Scope of work: Design, Supply and erection:-
  • Inlet system.
  • Coarse Screen.
  • Fine screen.
  • Equalization zone.
  • DAF system.
  • Grit & Grease removal system.
  • Clariflocculation zone.
  • Surface aeration oxidation zone.
  • Final clarifier zone.
  • Excess sludge pumps.
  • Return sludge pumps.
  • Mechanical Sludge thickener system.
  • Sludge dewatering System.
  • Chemical dosing system
  • Scada system